Fieldwork

Anticipated Studies

We will conduct a variety of studies and surveys during different phases of project development. The project team will use these field surveys to verify or collect new information about the proposed route to help minimize impacts related to structure locations and construction of the transmission line.

Field surveys will occur in 2026, and the project team will request permission to access private property to conduct required field surveys. Property owners will receive more detailed information in advance of teams conducting surveys on private property.

Possible surveys include the following, which may vary by location:

  • Geotechnical

  • Biological

  • Cultural resources

  • Wetland and waterbodies

  • Invasive speciesĀ 

  • Protected species

  • Raptor nest